Project G922 – Custom Steel Lighting Poles for EU Municipal Infrastructure

Engineering-Led Case Study – On-Site Validation for EU Municipal Infrastructure

On-site engineering validation and quality control of custom steel lighting poles for EU municipal infrastructure, including dimensional inspection, welding verification, electrical safety testing, and pre-production engineering correction.

Custom Steel Lighting Poles for EU Municipal Infrastructure - Project Overview

  • Project Code: G922

  • Product: Custom-designed steel lighting poles

  • Application: Urban public lighting infrastructure

  • Scope: Engineering validation, dimensional control, production supervision, electrical safety verification, and pre-shipment inspection

  • Market: EU public / municipal projects

Project G922 involved the manufacturing and on-site validation of custom steel lighting poles intended for long-term urban deployment. The project required strict alignment between approved engineering drawings, real production output, and installation realities in public infrastructure environments.

SHAMANA was engaged to provide on-site engineering control, ensuring that what was designed was exactly what was manufactured, tested, and shipped.

 

Technical Specifications

(Validated Physically on Site)

All critical dimensions were measured directly on the production floor and cross-checked against approved technical drawings.

  • Total pole height: approx. 8,036 mm

  • Base flange: 400 × 400 mm

  • Flange thickness: approx. 16 mm

  • Pole structure: Tapered steel body

  • Service access: Integrated access door for wiring and maintenance

  • Surface treatment: Industrial outdoor coating, uniform and defect-free

Dimensional verification was not theoretical. Measurements were taken directly on the steel components prior to packaging.

Quality Control & Inspection Process

SHAMANA conducted a full structural and dimensional inspection, including:

  • Base flange dimensions and bolt-hole positioning

  • Verticality and straightness of the pole body

  • Thickness verification of load-bearing elements

  • Service door positioning and internal clearance

  • Weld quality inspection (base plate, arm joints, structural seams)

  • Packaging method and container loading verification

All inspections were documented photographically and validated directly on site, not via supplier self-declaration.

Inspection report project G922 - proof

Functional test

Engineering Corrections Applied Before Mass Production

Issue Identified

During inspection, SHAMANA identified a critical structural deviation:

  • The curved arm terminal length was insufficient for safe welding and long-term mechanical reliability.

  • While visually acceptable, the shortened end reduced weld penetration area and compromised stress distribution under load.

 

This was a structural risk, not a cosmetic issue.

Corrective Action

  • Engineering correction of +30 mm minimum added to the curved arm terminal.

  • Updated technical drawing issued and validated before series production.

This modification significantly improved:

  • weld integrity

  • load behavior under wind and vibration

  • long-term fatigue resistance

The correction prevented a hidden failure risk that would not have been visible after installation.

Electrical Safety & Compliance Verification

Beyond mechanical validation, the project included electrical safety testing aligned with EU requirements.

HI-POT (Dielectric Withstand) Testing

  • Individual high-voltage insulation testing performed on the electrical system.

  • Test conditions aligned with LVD (2014/35/EU) safety requirements.

  • Verification of insulation integrity between live parts, secondary circuits, and accessible metal structures.

 

This confirms that electrical safety was physically tested, not assumed.

CE / EMC / LVD Documentation

The project is supported by:

  • CE EMC Test Reports

  • Verification of Compliance

  • EU Declaration of Conformity

  • Component-level certifications (including driver documentation)

Documentation and on-site testing are consistent and mutually reinforcing: what is declared is what was tested.

Packaging & Logistics Control

  • Poles individually protected against abrasion and impact

  • Packaging designed to maintain straightness during transport

  • Container loading optimized for stability and space efficiency

  • No deformation or surface damage observed during packing

SHAMANA Verdict

✔️ Product execution: Good

✔️ Manufacturing quality: Consistent

✔️ Engineering control: Critical and effective

✔️ Risk mitigation: Successfully applied before mass production

Project G922 demonstrates how on-site engineering verification prevents structural and safety risks that are commonly missed in document-only or remote sourcing models.

Implementation proof

What This Case Proves

  • Real sourcing is not about drawings. It is about what gets welded, measured, tested, and shipped.

  • Small dimensional deviations can generate major downstream risks in public infrastructure.

  • Engineering presence on the ground changes outcomes, not just reports.

 

This project demonstrates how custom steel lighting poles for EU municipal infrastructure require on-site engineering validation, dimensional control, and electrical safety testing to eliminate structural and compliance risks before mass production.

Manufacturing & Finish Assessment

  • Welds: Clean, continuous, no visible porosity or thermal deformation

  • Surface coating: Uniform, no bubbling, peeling, or contamination

  • Cut-outs & openings: Clean edges, controlled tolerances

  • Overall execution: Suitable for municipal-grade infrastructure with long service life expectations

هل لديك مشروع في ذهنك؟

انضم إلينا كعضو مجاني واطلع على جميع كتالوجاتنا اليوم!

شركة شامانا للتوريد - تدقيق الموردين الصينيين: التحقق من الوضع القانوني، والقدرة الإنتاجية، والأدوات، والشهادات لضمان التصنيع المتوافق مع المعايير

أفضل الأسعار في العالم

دونغقوان شامانا للتجارة المحدودة.

رقم رخصة العمل:

91441900MA4WN5MJ8Y

ISO9001 SHAMANA Sourcing

رقم تسجيل رخصة التصدير:

04885825

تفضل بزيارة موقعنا الإلكتروني الخاص بالعرض الآن:

عرض هوروما من تصميم شامانا

اتصال

رقم الهاتف: +86 (0752) 589 8008

+86 400 8007103

VoIP: +40 31 229 5860

البريد الإلكتروني: office@shamana-china.com

المقر الرئيسي: RM 2001، بناية. 6، مركز هويشينغ التجاري، رقم 1 طريق دونغشنغ، شاندونغ الأوسط، شيلونج، دونغقوان، قوانغدونغ 523320


المكتب الفرعي: رقم 79-81 طريق شينغهو الغربي، قرية هوشان التجارية الجديدة، شيوان، هويتشو، قوانغدونغ

الصين

ISO14001-shamana.png
ISO45001-shamana.png

التعليمات

  • TikTok
  • Facebook
  • Instagram
  • Youtube
  • LinkedIn

جميع المحتويات الموجودة على هذا الموقع محمية بموجب قانون حقوق النشر. يُحظر منعاً باتاً استخدام أو نسخ أي مواد دون إذن.

© Copyright
© Copyright
bottom of page